Jump to main content

Building Redevelopment and Projects

Levelling of the site

View from the top of D block, looking over to the construction site. Most of the soil has to be taken off site. The lower site is to be levelled and have 2 courts constructed. There is a path going through the centre of the 4.5 courts.
View from on-site with Musgrave Park Pool in the background.
Levelling has begun for the 2 courts.
View from the back of G block

 

23/06/2001 80th Anniversary Address

Upcoming Dates

  • 11-12-2009 Last day for Year 8 & 9
  • 22-01-2010 Student Free Day
  • 25-01-2010 Student Free Day
  • 27-01-2010 Year 8 starts school
  • 28-01-2010 Years 9-12 start school
  • 29-01-2010 Student ID photos - Year 8 and new students
  • 09-02-2010 Prefect Induction

Style:  Justified Text Left-Justified Arial Trebuchet Georgia Verdana