Building Redevelopment

East Facing Walls lifted into place

14 September, 8.10am - Three panels on the east-facing wall are in place.
14 September, 1.53pm - The east-facing wall has been completed. The crane was been moved to the outside of the building. It is not longer required.
14 September, 1.55pm - This gap on the east-facing wall will remain as is. Other construction material will form this part of the wall.
14 September - Another section on the south-facing wall is left open.
14 September - Each of the support beams is bolted into concrete.

 