Building Redevelopment

North Facing Walls lifted into place

12 September, 7.36am - After a week of wind and rain, the first wall is lifted from the stack by the 80 ton crane.
12 September, 7.41am - It is manoeuvred onto the footings.
12 September - The metal supports anchor the panel.
12 September, 7.44am - The panel is levelled.
12 September, 7.55am - The supports are cross-braced.
12 September, 8.04am - Another team prepares the next panel by removing the form work and attaching the metal rods.
12 September, 9.39am - Four of the 15 metre panels are in place.
12 September - The metal braces that are currently holding up the panels.
12 September, 11.14am - The sixth panel is put into place.
12 September, 12.34pm - Nine panels are now in place on the north-facing wall.

 

23/06/2001 80th Anniversary Address

Upcoming Dates

  • 11-12-2009 Last day for Year 8 & 9
  • 22-01-2010 Student Free Day
  • 25-01-2010 Student Free Day
  • 27-01-2010 Year 8 starts school
  • 28-01-2010 Years 9-12 start school
  • 29-01-2010 Student ID photos - Year 8 and new students
  • 09-02-2010 Prefect Induction

Style:  Justified Text Left-Justified Arial Trebuchet Georgia Verdana